Finalizing Installation (Finishing)

Ramp Installation

Long Ramp 40 Inside Corner (Gradient 1/12)Long Ramp 40 Inside Corner (Gradient 1/12)
Long Ramp 40 (Gradient 1/12)Long Ramp 40 (Gradient 1/12)
Short Ramp 29 Outside Corner (Gradient 1/8)Short Ramp 29 Outside Corner (Gradient 1/8)

Ramp Cross Section

ショートスロープ部断面(ロングスロープ40・29共にバリアフリー法適合)

Nosing Installation

Nosing 40 Inside Corner / Outside CornerNosing 40  Inside Corner / Outside Corner
Nosing Cross SectionNosing

Partition Installation

Partition Installation (Post-Installation)Partition Installation (Post-Installation)

Partitioning can be installed anywhere above the Network Floor.

Easy Movable Partition Installation (Post-Installation)Post-Installation

In a post-installation, both concrete mats and cable path covers can be installed. The cable paths can be maintained, and users have greater flexibility when changing the layout.
A concrete drill is used to create a hole, and plugless anchors are used secure partitioning directly to the floor slab.

Easy Movable Partition Installation (Pre-Installation)Pre-Installation

Partitioning can be installed above the Network Floor before (pre-installation) and after (post-installation) the Network Floor itself is installed. This is also true for light iron partitioning.

Network Floor Inquiries

For inquiries, please contact us by using the inquiry form.

Network Floor Inquiries

For inquiries, please contact us by using the inquiry form.

Network Floor Menu
pagetop

Copyright (C)KYODO KY-TEC Corp. All Rights Reserved.

This website uses cookies to provide better services to our customers. Click here for more information about cookies.

Accept Cookies.