Partitioning can be installed anywhere above the Network Floor.
In a post-installation, both concrete mats and cable path covers can be installed. The cable paths can be maintained, and users have greater flexibility when changing the layout.
A concrete drill is used to create a hole, and plugless anchors are used secure partitioning directly to the floor slab.
Partitioning can be installed above the Network Floor before (pre-installation) and after (post-installation) the Network Floor itself is installed. This is also true for light iron partitioning.